This project was between three schools in the West Seneca school district. Our scope consisted of: Installation of all erosion control. Removal of concrete sidewalks and headwalls. Removal of 125′ of sanitary sewer and 2 manholes. Installation of temporary access roads and staging areas, 34,000 Sqft. Installation of 600′ of storm sewer and 5 catch basins. Installation of 100′ of sanitary sewer and 1 manhole. Excavation and backfill for over 400′ of new footings and walls, including spread footings, step walls, and new building pads. All prep/grade work for 350′ of new sidewalk. All final grading and hydro seeding. 42,000 Sqft.
West Seneca CSD
West Seneca, NY